Carson City area road report through Oct. 4
Here is the Carson City area road report for the week of Sept. 28 through Oct. 4, 2015. Utility work will continue Monday through Thursday with flagger controlled traffic at the following locations:
— Fleischmann Way between Mountain Street and Division Street.
— Mountain Street between Fleischmann Way and Long Street.
— Long Street between Mountain Street and Division Street.
— Division Street between John Street and Long Street.
— Sierra Circle.
— Hillside Way.
— Miller Way.
— Pine View Way.
— Lane Circle.
The Nevada Department of Transportation (NDOT) will continue bridge maintenance on the Carson City Freeway (I-580) with nightly lane closures and intermittent on and off ramp closures during weeknights from 8 p.m. to 6:00 a.m.
NDOT will continue paving operations on I-580 in Washoe Valley. There will be nightly lane closures from 9:00 p.m. to 11:30 p.m. for the next several weeks from the North Carson Street interchange to the Bowers Mansion interchange (exit 50).
Beginning Tuesday, September 29, through Friday, October 2, Oregon Street will be closed to through traffic between Roop Street and Wright Way. Detours will be signed, and access to the DMV will be available from Wright Way off of Stewart Street.
Race Track Road will continue to be closed between Bigelow Drive and Schulz Drive due to utility work. Detours will be signed.
The intersection of Cochise Street and Overland Street, as well as Overland Street between Cochise Street and Voltaire Street, will be closed to through traffic Monday through Friday from 7:00 a.m. to 5:00 p.m. Detours will be signed.
Utility work will continue Monday through Thursday at the following locations:
— Shoulder work on Washington Street between Ormsby Boulevard and Mountain Street.
— Bulette Drive and Bunker Hill Drive will both be closed at Washington Street during daytime hours. Detours will be signed.
On Thursday, Oct. 1, there will be shoulder work on Silver Oak Drive west of GS Richards Boulevard. Please use caution.
Due to sidewalk improvements, there will be lane closures at the following locations:
— Long Street between Carson Street and Stewart Street.
— The outside northbound lane on Carson Street between Park Street and Long Street.
— Fall Street at Long Street.
— Peters Street at Long Street.
The Nevada Department of Transportation will continue construction of drainage improvements on U.S. Highway 50 West between the two truck ramps (just west of U.S. 395 to Sierra Highlands Drive). There will be lane closures Monday through Friday, but the roadway will remain open to traffic in both directions.
Clear Creek Avenue remains closed to through traffic between Lynette Lane and Center Drive due to utility work. Detours are signed and the JAC bus stop on Clear Creek Avenue is temporarily relocated near the intersection of Frontage Road and Clear Creek Avenue.
Work on the construction of the Carson City Freeway continues. Please use caution in the areas around the construction site, particularly along S. Carson Street.
- Carson City
- Carson City Freeway
- 2015
- 395
- carson
- Carson Street
- caution
- center
- City
- closed
- construction
- Daytime
- Fall
- FRIDAY
- highway
- Hours
- long street
- maintenance
- mountain
- NDOT
- Nevada
- Nevada Department of Transportation
- News
- October
- Oregon
- Pine
- race
- Race Track
- Sierra
- silver
- The Nevada Department of Transportation
- truck
- U
- Washington
- Washoe
- Washoe Valley
- DMV
- Freeway
- Traffic