Here is the South Carson Street Project and Carson City area road report for the week of August 3-9, 2020. For information on lane restrictions and street closures related to the South Carson Street Project, please visit CarsonProud.com.
SNC has made great strides on the South Carson Street project. Carson Street between 5th and Stewart underwent major improvements on the storm drainage system. Crews have already started the curb and gutter work on the roundabout and the roundabout is taking shape. See the video presentation by John Platt, senior construction inspector, here.
Much of the surrounding roadways are nearly ready for paving. October is drawing near and it’s clear based on the construction milestones. Businesses are accessible throughout the project.
Here's the South Carson Street Project construction update for August 3-7:
— South Carson Street from 5th Street to Fairview one lane in each direction will be open, the cone zone will remain in place around-the-clock, flaggers as needed.
— Stewart Street intersection at the Carson Street will be closed.
— Frontage Road is open to two-way traffic with temporary driveway closures.
— Fairview Drive at California Street to South Carson Street will be closed on August 6 in the afternoon with Roop to Colorado detour.
— Colorado Street will be closed on August 4 in morning for grading work.
— Colorado Street closed to roadway work August 6 during the morning hours.
— South Carson Street at Clearview to Fairview: one lane in each direction, the cone zone will remain in place around-the-clock.
— South Carson Street at Rhodes to Stewart: east side roadway work.
Elsewhere around Carson City, closures are expected at the following locations due to road and utility work:
— Airport Road remains closed in both directions to through traffic between US 50 and Woodside Drive, Monday through Friday, 7 a.m. to 5:30 p.m. Residential and business access will be allowed. JAC service will continue; however, detours will be in effect.
— Retail Court will be closed east of College Parkway, Monday through Friday, all day. Access to the businesses will be maintained. There may also be periodic closures and detours to the multi-use path between Emerson Drive and Retail Court.
Lane restrictions are expected at the following locations due to road, utility work:
— Airport Road will have flagger controls between Minonee Lane and Woodside Drive, Monday through Friday, 7 a.m. to 5:30 p.m. while crews begin construction of the waterline.
— US Highway 50 West will have single lane closures from Golf Course Drive to Spooner Summit in both directions, Monday through Friday, 7 a.m. to 6 p.m. to enhance roadside drainage. Motorists are asked to drive at posted construction speed limits, or slower as necessary for conditions.