Carson City area road report for week of May 9-15
Here is the Carson City road report for the week of May 9-15, 2022. Closures are expected at the following locations due to road and utility work:
— Center Drive between Snyder Avenue and Clear Creek Avenue will be closed, Monday through Thursday, 7:00am to 5:30pm for roadway reconstruction. Please use the designated detour route, Clear Creek Avenue and Snyder Avenue and use caution.
— Russett Way between Winnie Lane and Jeneall Drive will be closed, Monday through Saturday, 7:00am to 4:00pm for roadway reconstruction.
Robinson Street Sewer and Water Line Replacement Project Closures 7:00am to 5:30pm:
— Caroline Street between Mountain Street and Elizabeth Street will be closed on Monday, 7:00am to 5:30pm.
— Caroline Street between Mountain Street and Phillips Street will be closed on Tuesday, 7:00am to 5:30pm.
— Robinson Street at Division Street will be closed Monday through Wednesday, 7:00am to 5:30pm.
— Robinson Street at Minnesota Street will be closed on Tuesday, 7:00am to 5:30pm.
— Robinson Street at Mountain Street will be closed on Thursday, 7:00am to 5:30pm.
— Telegraph Street at Phillips Street will be closed on Monday, 7:00am to 5:30pm.
Lane restrictions are expected at the following locations due to road and utility work:
— Carson Street between Hot Springs Road and Winnie Lane will have shoulder work, Monday through Friday, 7:00am to 4:00pm for utility work.
— Hobart Road at Reds Grade and at County Line Road will be reduced to one lane with flaggers and have shoulder work, Monday through Thursday, 8:00am to 5:00pm.
— Kings Canyon Road west of Longview Way will have lane closures and flaggers, Monday through Friday, 7:00am to 5:00pm for striping and shoulder work.
— Lakeview Road at Levi Gulch and at Combs Canyon will be reduced to one lane with flaggers and have shoulder work, Monday through Thursday, 8:00am to 5:00pm for storm drain improvements.
— Emerson Drive between College Parkway and I-580 will have narrowed lanes, Monday through Thursday, 7:00am to 4:00pm for utility work.
— Long Street between Roop Street and Rand Avenue will be reduced to one lane with flaggers, Monday through Saturday, 7:00am to 5:30pm for roadway reconstruction.
— Long Street at Roop Street will be flagger controlled, Monday, 7:00am to 5:30pm for roadway reconstruction.
— Rand Avenue between William Street and Camille Drive will be reduced to one lane with flaggers, Monday through Saturday, 7:00am to 5:30pm for roadway reconstruction.
— Center Drive between Clear Creek and Gibson will have shoulder work, Monday through Thursday, 7:00am to 5:30pm for utility work.
— Curry Street between Musser Street and 5th Street will have narrowed lanes, Monday through Thursday, 7:00am to 5:30pm for utility work.
— Industrial Park Drive between California Street and Idaho Street will have narrowed lanes, Wednesday, 7:00am to 4:00pm for utility work.
— 5th Street at Well Way will have shoulder work and sidewalk closures on the south side of the street, Monday, 8:30am to 5:30pm for utility work. Please use caution.
Fairview Drive at 5th Street may have traffic delay, up to 20 minutes, for a freight transport escort on Wednesday, 8:30am to 5:00pm.